Building/Structure Moves

If you are moving a building or commercial equipment or structure, a ten day work clearance/permit is required. Submit a Building and Structure Move Application online.

Application forms are also available by calling 1-888-MBHYDRO (1-888-624-9376) and at your local district office.

The building or structure move application form provides Manitoba Hydro with information on:

  • the mover;
  • the type of structure;
  • load height;
  • route and map;
  • requested time and date.

It will also:

  • provide the mover with the terms and conditions which must be agreed to before a move takes place;
  • assist in the completion of the Electric and/or Natural Gas Facilities Locate form to comply with the Workplace Safety and Health Act, W210. This form is separate from the Application and a copy of the Electric and/or Natural Gas Facilities Locate form will accompany the move.

Regulations and Permits for Oversize Moves

Oversized loads that exceed 4.15 metres (13' 7") require the mover to contact Manitoba Transportation and Government Services or the local municipality where the move is taking place. This includes the cities of Brandon and Winnipeg jurisdictions.

If the oversize load exceeds the height of 4.8 m (15' 9"), written instructions are required from Manitoba Hydro prior to conducting the move. These written instructions will indicate the types of hazards present and what actions are required on the mover's part to ensure their safety, and the safety of others, while working near overhead lines.

We require a minimum of 10 working days notice for loads up to 5.9 metres (19' 4") in height. Loads taller than 5.9 metres will need additional notice.

For more information about moving large structures near Manitoba Hydro lines, contact your local district office.