NERC Rules of Procedure effective in Manitoba
The North American Electric Reliability Corporation (NERC) develops Reliability Standards related to the operation of the bulk power system.
On April 1, 2012, the Province of Manitoba enacted the Reliability Standards Regulation, which makes compliance with NERC Reliability Standards a legal requirement in Manitoba.
- View NERC Rules of Procedure effective in Manitoba (PDF, 1.3 MB)
The NERC Rules of Procedure, adopted under subsection 3(3) of the Reliability Standards Regulation, are posted as required per subsection 3(6).
Manitoba Hydro Reliability Standards
Pursuant to section 15.0.2 of The Manitoba Hydro Act ( C.C.S.M. c. H-190), the following Manitoba Hydro reliability standards are binding in the province of Manitoba.
- View MH-TPL-001-4 Transmission System Planning Performance Requirements (PDF, 418 KB)
- View MH-TPL-007-2 Transmission System Planning Performance Requirements for Geomagnetic Disturbance (GMD) Events (PDF, 142 KB)